INSTALLED CAPACITY & GENERATION

Position Ending 30.6.2011

S.No.

Name of Project

Detail of Power  machines with
installed capacity (MWs)

Share of  
Punjab(MWs)

Gross Generation during
the year 2011-12(MUs)

I

OWN PROJECTS

 

 

 

a)

HYDRO ELECTRIC PROJECTS

0

 

 

1

Shanan PHs

4X 15+1X50=110.00

110

209.276

2

UBDC

3X15+3X15.45 =91.35

91.35

110.241

3

Mukerian

6X15+6X19.5=207.00

207
174.297

4

Anandpur Sahib

4X33.5=134.00

134
237.622

5

RSD

4X150=600.00

452.4
518.477

6

Nadampur Micro

2X0.4=0.80

0.8
1.545

7

Daudhar Micro

3X0.5=1.50

1.5

8

Rohti Micro

2X0.4=0.80

0.8

9

Thuhi Micro

2X0.4=0.80

0.8

10

GGSSTP ROPAR(micro)

2x0.85

1.7

 

Total

 

1000.350
1251.458

b)

THERMAL PROJECTS

No.& Capacity of
units(MW)

Total Capacity
(MW)

GROSS GENERATION
during the year 2011-12 (MUs)

1

GNDTP, BATHINDA

4X110 =440.00

440.000
399.174

2

GGSSTP, ROPAR

6X210 =1260.00

1260.000
2385.34

3

GHTP,Lehra Mohabat

2x210+2x250=920.00

920.000
1678.19

 

Total Thermal

 

2620.000
4462.706

 

Total hydro +Thermal (a) +(b)

 

3620.350
5714.164

II

Share From BBMB Pojects

 

1257.966
1275.158

III

Net of import (Including Share from Central Sector Projects)& export

 

1973.000
5941.709

IV

Cogeneration (PEDA & Captive Power Plants&Jalkheri)

 

184.000
74.158

 

G.Total (I+II+III+IV)

 

7035.316
13005.189