Presentaion on GGSSTP, ending Dec 2009.

GGSSTP Performance since inception

Organization Chart

DATE OF SYNCHRONISATION

PERFORMANCE DATA OF GGSSTP ROOPNAGAR     (2009-10)

Date of commercial run

U# I

26.09.84

U# II

29.03.85

U# III

31.03.88

U# I

01.01.85

U#II

01.10.85

U# III

25.09.88

U# IV

29.01.89

U# V

29.03.92

U# VI

30.03.93

U # IV

01.08.89

U# V

29.09.92

U# VI

14.12.93

Year

Gen. Tar.

Total   Gen.

Sp.oil cons.

Sp. Coal

Aux. Cons.

DM/W Cons.

Th.Eff.

Heat Rate

Calorific Value 

PLF

PAF

P/O

F/O

R/O

Par. UAF

Ash Content

Trip.

Tr.Loss

Man Power

Coal Receipt

Coal Cons.

Cost at Gen. end

Cost at Bus.Bar

 NCV

GCV

 NCV

GCV

 NCV

GCV

Incl.P

Excl. P

with Intt/Dep.

MU

MU

Ml/ Kwh

Kg./  Kwh

(%)

(%)

(%)

 

Kcal/Kwh

Kcal/Kwh

(%)

(%)

  (%)

 (%)

(%)

(%)

(%)

(Nos)

(%)

(%)

M/MW

Lac.Ton

Lac.Ton

Paise/ Kwh

Paise/ Kwh

95-96

6740

6163.21

4.54

0.690

7.67

4.56

31.86

 

2699.19

 

3842

 

55.68

88.98

7.56

3.45

27.75

5.54

41.57

134

5.49

 

-

42.35

42.57

158.52

171.07

96-97

7000

7175.01

4.10

0.680

7.48

4.41

32.51

 

2645.27

 

3844

 

65.00

85.89

8.82

5.27

14.05

6.84

42.30

193

7.24

 

-

50.02

48.61

158.28

171.08

97-98

7765

7764.24

1.62

0.670

7.69

3.70

32.67

 

2632.07

 

3876

 

70.34

85.42

7.84

6.73

9.76

5.31

42.01

226

6.12

 

-

55.79

52.40

161.31

174.75

98-99

7356

7728.16

1.22

0.670

7.77

3.79

32.76

 

2625.27

 

3914

 

70.01

79.97

11.93

8.08

6.02

3.94

39.75

174

3.60

 

2.72

48.67

51.59

170.18

184.52

99-00

7483

8203.43

2.02

0.670

8.10

4.31

32.53

 

2643.91

 

3923

 

74.11

80.86

11.13

7.99

2.93

3.82

39.23

218

3.62

 

2.75

57.23

54.86

170.88

185.61

00-01

8400

8436.56

1.95

0.700

8.12

3.30

31.64

 

2718.03

 

3842

 

76.43

80.99

10.13

8.87

0.84

3.72

38.84

158

2.60

 

2.89

58.04

59.26

165.06

179.65

01-02

8450

8856.06

1.37

0.666

7.96

3.39

32.50

 

2646.56

 

3951

 

80.23

88.14

9.49

2.35

4.80

3.11

35.57

105

4.52

 

2.86

60.11

59.02

172.77

187.73

02-03

8500

8245.65

1.28

0.657

8.26

3.31

33.32

 

2581.06

 

3908

 

74.70

87.00

8.12

4.87

8.58

3.72

33.47

93

4.34

 

2.61

53.16

54.18

173.67

189.31

03-04

8649

8303.75

0.91

0.661

8.33

3.07

33.85

 

2540.47

 

3825

 

75.02

87.74

9.27

2.98

8.45

4.26

34.96

88

1.44

 

3.04

54.92

54.96

165.43

180.46

04-05

8895

9082.68

0.97

0.660

8.57

2.53

33.92

 

2535.71

 

3825

 

82.28

88.95

7.29

3.74

3.65

3.02

34.33

83

1.89

 

3.01

62.98

59.98

170.17

186.12

05-06

8865

9329.31

0.61

0.653

8.51

2.00

34.10

 

2522.33

 

3852

 

84.52

88.94

6.83

4.22

2.11

2.30

33.60

101

2.97

 

2.84

63.56

60.94

184.65

201.84

06-07

8900

9770.34

0.44

0.663

8.38

1.76

33.85

32.02

2540.79

2686.01

3825

4044

88.52

90.24

5.83

3.93

0.99

0.73

33.74

76

2.15

 

2.79

62.97

64.79

185.66

202.63

07-08

9200

9806.16

1.16

0.679

8.44

1.69

33.64

31.74

2556.37

2709.18

3747

3972

88.60

91.64

5.76

2.60

0.39

2.65

33.04

92

2.50

3.58

2.70

65.32

66.60

190.45

208.01

08-09

9200

9610.67

0.96

0.665

8.34

2.20

33.94

32.06

2533.81

2682.10

3796

4019

87.07

89.92

4.66

5.42

1.16

1.69

32.79

75

1.40

2.20

2.61

64.36

63.91

202.30

220.70

09-10

(UP TO 12/09)

7110 7705.74 0.64 0.666 8.20 1.73 34.35 32.45 2503.50 2650.00 3750 3970 92.66 93.88 3.99 2.13 0.12 1.10 33.71 50 0.43 0.76 2.59 53.7 51.31    
  W/o Intt.&Dep.(Upto month)

Apr.

715 788.03 0.52 0.665 8.19 1.96 34.17 32.31 2516.95 2661.92 3777 3995 86.86 87.31 10.03 2.65 0.00 0.45 34.13 4 0.32 0.45 2.61 5.45 5.24 180.97  

May

840 913.05 0.32 0.665 8.10 1.66 34.20 32.36 2514.90 2657.88 3777 3992 97.40 98.41 0.00 1.59 0.45 0.56 34.28 7 0.54 0.83 2.61 5.56 6.72 187.84  

Jun

810 867.41 0.41 0.665 8.25 1.76 34.27 32.40 2509.80 2654.11 3768 3985 95.61 96.10 0.00 3.90 0.00 0.49 34.15 8 1.24 2.20 2.59 2.72 5.77 191.26  

July

840 902.08 0.34 0.665 8.29 1.99 34.38 32.45 2501.18 2650.14 3756 3980 96.23 98.44 0.00 1.56 0.20 2.01 32.64 11 0.30 0.50 2.60 5.84 6.00 192.97  

Aug

840 933.75 0.36 0.665 8.22 1.66 34.42 32.50 2498.68 2646.31 3752 3974 99.61 99.18 0.00 0.82 0.00 0.43 34.18 2 0.31 0.51 2.60 6.31 6.21 192.99  

Sep

810 859.22 1.59 0.669 8.37 1.70 34.29 32.35 2507.95 2658.48 3725 3950 94.71 97.04 0.00 2.96 0.40 1.93 33.72 8 0.68 1.30 2.59 2.59 6.26 196.24  

Oct

840 919.74 0.72 0.668 8.17 1.64 34.42 32.48 2498.88 2647.84 3730 3953 98.11 98.25 0.00 1.75 0.00 0.14 32.98 2 -0.36 0.43 2.59 5.63 6.14 196.57  

Nov

710 759.88 0.22 0.667 7.92 1.66 34.58 32.66 2486.79 2633.53 3725 3945 83.76 87.31 0.00 1.03 0.00 3.55 33.43 2 0.43 0.90 2.59 6.52 5.07    

Dec

705 762.58 1.31 0.664 8.22 1.55 34.49 32.59 2493.14 2639.22 3735 3955 81.35 82.63 14.41 2.95 0.00 1.28 34.1 6     2.59 5.87 5.06    

Jan

                                                     

Feb

                                                     

Mar.

                                                     

Note: - Transit loss up to the month of 11/ 09.