ACHIEVEMENTS ENDING 30.06.09-- WEST ZONE, BATHINDA
- Total No. of Connections/Connected Load
| Sr.No. |
Category |
No. of Connections |
Connected load (in KW) |
| 1 |
DS |
1002020 |
1503271 |
| 2 |
NRS |
136807 |
376789 |
| 3 |
SP |
12786 |
123938 |
| 4 |
MS |
2090 |
130912 |
| 5 |
LS |
857 |
405305 |
| 6 |
SL |
247 |
3911 |
| 7 |
BS |
111 |
55314 |
| 8 |
AP |
270561 |
1524003 |
| |
Total |
1425479 |
4123443 |
2. Release of Connections
| Sr.No. |
Category |
05/09
No. |
During
06/09 |
upto06/09 |
| 1 |
GSC |
10535 |
4126 |
14661 |
| 2 |
ISC |
93 |
33 |
126 |
| 3 |
AP |
8021 |
2581 |
10602 |
| 4 |
Others |
11 |
11 |
22 |
| |
Total |
18660 |
6751 |
25411 |
3. Pending Test Reports
| Sr.No. |
Category |
Pending Test Reports (No.) |
Date of oldest Pending Test Report |
| 1 |
GSC |
9487 |
12/08 |
| 2 |
ISC |
176 |
4/09 |
| 3 |
AP |
47201 |
6/98 |
| Total |
57164 |
|
4. Grid Sub-Stations
| Sr.No. |
Description |
No. |
Installed Capacity (in MVA) |
No. |
Installed Capacity (in MVA) |
| During 06/09 |
upto 06/09 |
| 1 |
220 KV |
0 |
0 |
8 |
1313.580 |
| 2 |
132 KV |
0 |
0 |
25 |
847.000 |
| 3 |
66 KV |
0 |
0 |
120 |
1976.750 |
| 4 |
33 KV |
0 |
0 |
36 |
425.000 |
| |
Total |
0 |
0 |
189 |
4562.330 |
5.
| Sr.No. |
Description (Length) |
Length of lines (in KMs) |
| upto 05/09 |
During
06/09 |
upto 06/09 |
| 1 |
11 KV |
|
48315.00 |
319.00 |
48634.00 |
| 2 |
LT |
|
41633.00 |
3.00 |
41636.00 |
6. De-loading of Distribution T/Fs
| Sr.No. |
Capacity of DS T/F |
No. of DS T/Fs de-loaded |
| upto 05/09 |
During
06/09 |
upto 06/09 |
| 1 |
25 KVA |
|
0 |
58 |
58 |
| 2 |
63 KVA |
|
9 |
106 |
115 |
| 3 |
100 KVA |
|
2 |
31 |
33 |
| 4 |
200 KVA |
|
0 |
7 |
7 |
| Total |
|
|
11 |
202 |
213 |
7. Distribution Transformers
| Sr.No. |
Distribution T/Fs (in KVA) |
upto 05/09 |
During
06/09 |
upto 06/09 |
| (Nos.) |
(Nos.) |
(Nos.) |
| 1 |
6.3 KVA |
25216 |
974 |
26190 |
| 2 |
10/16 KVA |
11645 |
120 |
11765 |
| 3 |
25 KVA |
24064 |
-225 |
23839 |
| 4 |
63 KVA |
19178 |
-280 |
18898 |
| 5 |
75 KVA |
3 |
0 |
3 |
| 6 |
100 KVA |
11593 |
40 |
11633 |
| 7 |
200 KVA |
1075 |
3 |
1078 |
| 8 |
300 KVA |
83 |
0 |
83 |
| 9 |
400 KVA |
3 |
0 |
3 |
| 10 |
500 KVA |
41 |
0 |
41 |
| 11 |
750 KVA |
0 |
0 |
0 |
| 12 |
1000 KVA |
2 |
0 |
2 |
| Total |
92903 |
632 |
93535 |
8. UPS to Villages
| a) Total No of Villages |
2431 |
Nos. |
| b) UPS given end. 29.02.08 |
2431 |
Nos. |
9. T & D Losses
| Billing cycle |
2008-09 |
200-10 |
% Increase/ Decrease |
| Ending Cy-1 |
32.13 |
31.95 |
-0.18 |
| Ending Cy-2 |
32.04 |
31.85 |
-0.19 |
10
Revenue of West Zone
(Rs. In lacs) |
upto 05/09 |
During
06/09 |
upto 06/09 |
| 15803.44 |
9498.22 |
25301.66 |
11. Replacement of Electro-mechanical Meters with Electronic Meters
| Category |
No. of Connections |
Replaced with Electronics Meters |
%age |
During
06/09 |
upto 06/09 |
| GSC |
1138826 |
5443 |
654387 |
57.46 |
| SP |
12786 |
35 |
12642 |
98.87 |
| MS |
2091 |
-1 |
2089 |
99.90 |
| Total |
1153703 |
5477 |
669118 |
58.00 |
|