|
ACHIEVEMENTS ENDING 12/2010-- WEST ZONE, BATHINDA
- Total No. of Connections/Connected Load
Sr.No. |
Category |
No. of Connections |
Connected load (in KW) |
1 |
DS |
1026158 |
1533322 |
2 |
NRS |
138476 |
391416 |
3 |
SP |
13171 |
128103 |
4 |
MS |
2171 |
137060 |
5 |
LS |
905 |
417418 |
6 |
SL |
275 |
4460 |
7 |
BS |
110 |
54483 |
8 |
AP |
300515 |
1865093 |
|
Total |
1481781 |
4531355 |
2. Release of Connections
Sr.No. |
Category |
4/09 to 12/09
No. |
During
1/2010 |
upto1/2010 |
1 |
GSC |
41368 |
4933 |
46301 |
2 |
ISC |
539 |
80 |
619 |
3 |
AP |
38426 |
3042 |
41468 |
4 |
Others |
141 |
45 |
186 |
|
Total |
80474 |
8100 |
88574 |
3. Pending Test Reports
Sr.No. |
Category |
Pending Test Reports (No.) |
Date of oldest Pending Test Report |
1 |
GSC |
13449 |
7/09 |
2 |
ISC |
109 |
6/09 |
3 |
AP |
38835 |
6/98 |
| Total |
52393 |
|
4. Grid Sub-Stations
Sr.No. |
Description |
No. |
Installed Capacity (in MVA) |
No. |
Installed Capacity (in MVA) |
During 12/2010 |
upto 12/2010 |
1 |
220 KV |
0 |
0 |
10 |
1358.580 |
2 |
132 KV |
0 |
0 |
26 |
847.000 |
3 |
66 KV |
0 |
0 |
139 |
2210.250 |
4 |
33 KV |
0 |
0 |
28 |
314.000 |
|
Total |
0 |
0 |
203 |
4729.830 |
5.
| Sr.No. |
Description (Length) |
Length of lines (in KMs) |
| 4/09 to 12/09 No |
During
1/2010 |
upto 1/2010 |
1 |
11 KV |
|
52030.00 |
465.00 |
52495.00 |
2 |
LT |
|
41643.00 |
-16.00 |
41627.00 |
6. De-loading of Distribution T/Fs
| Sr.No. |
Capacity of DS T/F |
No. of DS T/Fs de-loaded |
| 4/09 to 12/09 No |
During
1/2010 |
upto 1/2010 |
1 |
25 KVA |
|
308 |
17 |
325 |
2 |
63 KVA |
|
340 |
22 |
362 |
3 |
100 KVA |
|
97 |
13 |
110 |
4 |
200 KVA |
|
7 |
0 |
7 |
Total |
|
|
752 |
52 |
804 |
7. Distribution Transformers
| Sr.No. |
Distribution T/Fs (in KVA) |
4/09 to 12/09 |
During
1/2010 |
upto 1/2010 |
| (Nos.) |
(Nos.) |
(Nos.) |
| 1 |
6.3 KVA |
35231 |
550 |
35781 |
| 2 |
10/16 KVA |
14960 |
278 |
15238 |
| 3 |
25 KVA |
23977 |
548 |
24525 |
| 4 |
63 KVA |
18958 |
399 |
19357 |
| 5 |
75 KVA |
3 |
0 |
3 |
| 6 |
100 KVA |
11865 |
182 |
12047 |
| 7 |
200 KVA |
1074 |
0 |
1074 |
| 8 |
300 KVA |
82 |
-1 |
81 |
| 9 |
400 KVA |
3 |
0 |
3 |
| 10 |
500 KVA |
41 |
0 |
41 |
| 11 |
750 KVA |
0 |
0 |
0 |
| 12 |
1000 KVA |
2 |
0 |
2 |
Total |
106196 |
1956 |
108152 |
8. UPS to Villages
| a) Total No of Villages |
2431 |
Nos. |
| b) UPS given end. 29.02.08 |
2431 |
Nos. |
9. T & D Losses
Billing cycle |
2008-09 |
2009-10 |
% Increase/ Decrease |
| Ending Cy-1 |
32.71 |
31.95 |
-0.76 |
| Ending Cy-2 |
32.13 |
31.85 |
-0.28 |
| Ending Cy-3 |
30.43 |
29.43 |
-1.00 |
| Ending Cy-4 |
28.28 |
27.24 |
-1.04 |
10
Revenue of West Zone
(Rs. In lacs) |
upto 11/09 |
During
12/10 |
upto 12/10 |
| 67804.59 |
9278.91 |
77083.50 |
11. Replacement of Electro-mechanical Meters with Electronic Meters
| Category |
No. of Connections |
Replaced with Electronics Meters |
%age |
During
12/09 |
upto 12/2010 |
| GSC |
1160204 |
8520 |
695324 |
59.93 |
| SP |
13075 |
55 |
1929 |
98.88 |
| MS |
2142 |
20 |
2142 |
100.00 |
| Total |
1175421 |
8595 |
710395 |
60.44 |
|