SHANAN POWER HOUSE, PSEB, JOGINDER NAGAR (110 MW)

110 MW Shanan Project is the most picturesque project in the beautiful surroundings of Himalayan ranges. It is situated in the North Indian State, Himachal Pradesh at an approximately longitude of 76 degree – 51’ East and latitude of 32 degree – 2’ North. It takes advantage of two small rivulets at an altitude of about 6000 ft., in Brot valley. The idea of harnessing a power potential of 4X12 MW (48 MW) initially was envisaged by Col. Battye, the then Chief Engineer of Govt. of Punjab in 1922. This 48 MW Stage Ist Project was constructed at the initial cost of Rs. 2,53,43,709/- and commissioned in 1932 and was officially opened by His Excellency, The Viceroy of India at Shalimar Receiving Station, Lahore on 10th March, 1933.

Shanan Power House, 1st Stage of 4X12 = 48 MW was renovated to 4X15 = 60 MW in 1982. No major work in the form of additions and alterations in Head works, water conductor system, Power House building was involved.

The Shanan renovation project was finally commissioned in December, 1982.

SHANAN EXTENSION PROJECT (50 MW).

As originally conceived by Col. Battye, the extension of the 1st Stage of Uhl river Project was proposed by constructing an additional unit of 50 MW. This extension work  mainly consisted of a new extended reservoir at Brot, laying of new penstock for 50 MW and construction of new power house building. Finally this project with unit of 50 MW was commissioned in March, 1982.

SALIENT FEATURES OF SHANAN POWER HOUSE

Sr. No.

Description

Shanan 1st Stage

Shanan Extension

1.

Rating of each unit

15 MW

50 MW

2.

No. of units at PH

4 Nos.

1 No.

3.

Manufacturer

GANZ MAVAG, Hungary

GANZ MAVAG, Hungary

4.

Turbine out put

21800 HP

70000 HP

5.

Max Net Head

548 M

548 M

6.

Min. Net Head

446 M

481.6 M

7.

Rated Net Head

487.7 M

487.7 M

8.

Discharge required

525 Cusecs

425 Cusecs

9.

Type of turbine

Horizontal Pelton Wheel

Vertical Pelton Wheel

10.

No. of Blades

21

22

11.

Dia of Runner

2569 mm

2800 mm

12.

Generator Voltage

11000 Volts

11000 Volts

13.

Type of Generator

Horizontal Shaft

Suspension

14.

Normal speed

428.5 RPM

375 RPM

GENERATION ACEIVEMENTS (In MUs):

Sr. No.

Year

Generation
(In MUs)

1.

1982-83

424.896

2.

1983-84

540.674

3.

1984-85

470.209

4.

1985-86

521.016

5.

1986-87

530.903

6.

1987-88

517.389

7.

1988-89

567.361

8.

1989-90

538.650

9.

1990-91

573.176

10.

1991-92

577.252

11.

1992-93

591.523

12.

1993-94

512.253

13.

1994-95

533.594

14.

1995-96

551.697

15.

1996-97

507.401

16

1997-98

600.019

17.

1998-99

637.183

18.

1999-2000

506.507

19.

2000-01

487.703

20.

2001-02

473.110

21.

2002-03

469.279

22.

2003-04

564.205

23.

2004-05

515.474

24.

2005-06

508.950

25.

2006-07

495.666

Shanan Hydel Project has achieved the record generation of 637.18 MUs in the year1998-99since its commissioning, which was the milestone in the history of Shanan Hydel Project.