| 1) |
Location: |
The Project is to be executed on River Ravi.
11 KM downstream of Ranjit Sagar Dam and 7.8 KM upstream of Madhopur Head
works. |
| 2) |
Main Features: |
It will provide a balancing Reservoir to
ensure Uniform supply at Madhopur Head works and to enable Ranjit Sagar
Power Plant to work as a peaking station. |
| 3) |
No of Power Houses: |
Two |
| 4) |
No. of Units: |
- 5 Nos.
- 2 Units of 40 MW each plus 10% overloading capability.
- 2 Units of 40 MW each plus 10% overloading capability and a mini unit of 8 MW.
|
| 5) |
Total Generating Capacity |
2x40 + 2x40 + 1x8 = 168 MW
Punjab Share = 134.34 MW
|
| 6) |
Design Head: |
27.93 M |
| 7) |
Design Discharge: |
13600 Cusecs |
| 8) |
Type of development: |
Reservoir |
| 9) |
Commissioning |
Year 2006-07 |
| 10) |
Total Energy Contribution Annually: |
| 1043 Mus. (for 168 MW) |
| 834 Mus. (Pb.share= 134.4 MW) |
|
| 11) |
Cost per unit: |
Rs. 3.38 |
| 12) |
Cost of the Project: |
Rs. 1750 Crore (4/2000) |
| 13) |
Funds requirement: (Rs. In Crores) |
| 2001-02 |
2002-03 |
2003-04 |
2004-05 |
2005-06 |
| 190 |
275 |
515 |
445 |
335 |
|
| 14) |
Clearances & present status: |
| i) This project stands cleared by CEA, Ministry of
Environment & Forest & Planning Commission. |
| ii) The required land has been acquired. |
|