INSTALLED CAPACITY &GENERATION

   
Position Ending 30.09.2009
 

S.No.

Name of Project

Detail of Power  machines with
installed capacity (MWs)

Share of  
Punjab(MWs)

Gross Generation during
the year 2009-10 UPTO Dec /09(MUs)

I

OWN PROJECTS

 

 

 

a)

HYDRO ELECTRIC PROJECTS

 

 

 

1

Shanan PHs

4X 15+1X50=110.00

110

445.325

2

UBDC

3X15+3X15.45 =91.35

91.35

279.685

3

Mukerian

6X15+6X19.5=207.00

207
796.327

4

Anandpur Sahib

4X33.5=134.00

134
445.19

5

RSD

4X150=600.00

452.4
912.065

6

Nadampur Micro

2X0.4=0.80

0.8
9.041

7

Daudhar Micro

3X0.5=1.50

1.5

8

Rohti Micro

2X0.4=0.80

0.8

9

Thuhi Micro

2X0.4=0.80

0.8

10

GGSSTP ROPAR(micro)

2x0.85

1.7

 

Total

 

1000.350
2887.633

b)

THERMAL PROJECTS

No.& Capacity of
units(MW)

Total
Capacity
(MW)

GROSS GENERATION
during the year 2009-10 UPTO Dec/09 (MUs)

1

GNDTP, BATHINDA

4X110 =440.00

440.000
2175.167

2

GGSSTP, ROPAR

6X210 =1260.00

1260.000
7705.83

3

GHTP,Lehra Mohabat

2x210+2x250=920.00

920.000
5584.10

 

Total Thermal

 

2620.000
15465.096

 

Total hydro +Thermal (a) +(b)

 

3620.350
18352.729

II

Share From BBMB Pojects

 

1257.966
3141.444

III

 

Net of import (Including Share from Central Sector Projects)& export

 

1900.000
11443.074

IV

Cogeneration (PEDA & Captive Power Plants&Jalkheri)

 

63.900
166.674

 

G.Total (I+II+III+IV)

 

6842.216
33103.921