INSTALLED CAPACITY &GENERATION
| |
|
Position Ending 30.09.2009 |
|
S.No. |
Name of Project |
Detail of Power machines with
installed capacity (MWs) |
Share of
Punjab(MWs) |
Gross Generation during
the year 2009-10 UPTO Dec /09(MUs) |
I |
OWN PROJECTS |
|
|
|
a) |
HYDRO ELECTRIC PROJECTS |
|
|
|
1 |
Shanan PHs |
4X 15+1X50=110.00 |
110 |
445.325 |
2 |
UBDC |
3X15+3X15.45 =91.35 |
91.35 |
279.685 |
3 |
Mukerian |
6X15+6X19.5=207.00 |
207 |
796.327 |
4 |
Anandpur Sahib |
4X33.5=134.00 |
134 |
445.19 |
5 |
RSD |
4X150=600.00 |
452.4 |
912.065 |
6 |
Nadampur Micro |
2X0.4=0.80 |
0.8 |
9.041 |
7 |
Daudhar Micro |
3X0.5=1.50 |
1.5 |
8 |
Rohti Micro |
2X0.4=0.80 |
0.8 |
9 |
Thuhi Micro |
2X0.4=0.80 |
0.8 |
10 |
GGSSTP ROPAR(micro) |
2x0.85 |
1.7 |
|
Total |
|
1000.350 |
2887.633 |
b) |
THERMAL PROJECTS |
No.& Capacity of
units(MW) |
Total
Capacity
(MW) |
GROSS GENERATION
during the year 2009-10 UPTO Dec/09 (MUs) |
1 |
GNDTP, BATHINDA |
4X110 =440.00 |
440.000 |
2175.167 |
2 |
GGSSTP, ROPAR |
6X210 =1260.00 |
1260.000 |
7705.83 |
3 |
GHTP,Lehra Mohabat |
2x210+2x250=920.00 |
920.000 |
5584.10 |
|
Total Thermal |
|
2620.000 |
15465.096 |
|
Total hydro +Thermal (a) +(b) |
|
3620.350 |
18352.729 |
II |
Share From BBMB Pojects |
|
1257.966 |
3141.444 |
III |
Net of import (Including Share from Central Sector Projects)& export |
|
1900.000 |
11443.074 |
IV |
Cogeneration (PEDA & Captive Power Plants&Jalkheri) |
|
63.900 |
166.674 |
|
G.Total (I+II+III+IV) |
|
6842.216 |