Acheivements Ending 31.12.2009-Border Zone,Amritsar
1. Total No. of Connections/Connected Load
| Sr.No. |
Category |
No. of Connections |
Connected load (in KW) |
| 1 |
DS |
872441 |
1344979 |
| 2 |
NRS |
156170 |
420103 |
| 3 |
SP |
19563 |
178772 |
| 4 |
MS |
2792 |
148879 |
| 5 |
LS |
463 |
255142 |
| 6 |
SL |
320 |
6135 |
| 7 |
BS |
178 |
63728 |
| 8 |
AP |
231478 |
1134505 |
| 9. |
RT |
1 |
10800 |
| |
TOTAL |
1283406 |
3563043 |
2.Release of Connections
| Sr.No. |
Category |
4/09 to 11/09 |
During 12/09 |
Upto 12/09 |
1 |
GSC |
34114 |
2201 |
36315 |
2 |
ISC |
306 |
52 |
358 |
3 |
AP |
1888 |
865 |
2753 |
4 |
Others |
187 |
25 |
212 |
| |
Total |
36495 |
3143 |
39638 |
3. Pending Test Reports Ending 12/2009
| Sr.No. |
Category |
Pending Test Reports (No.) |
Date of oldest Pending Test Report |
1 |
GSC |
13123 |
10.8.09 |
2 |
ISC |
50 |
13.11.09 |
3 |
AP |
5610 |
21.4.06 |
| Total |
18783 |
21.4.06 |
4. Grid Sub Station
| Sr.No. |
Description |
No. |
Installed Capacity (in MVA) |
No. |
Installed Capacity (in MVA) |
| During 12/09 |
upto 12/09 |
1 |
220 KV |
0 |
0 |
0 |
0.00 |
2 |
132 KV |
0 |
0 |
0 |
0.00 |
3 |
66 KV |
0 |
0 |
102 |
2005.95 |
4 |
33 KV |
0 |
0 |
4 |
22.00 |
|
Total |
0 |
0 |
106 |
2027.95 |
5.
| Sr.No. |
Description (Length) |
Length of lines (in KMs) |
| upto11/09 |
During
12/09 |
upto 12/09 |
1 |
11 KV |
23980 |
790 |
24770 |
2 |
LT |
35727 |
-297 |
35430 |
6. Deloading of Distribution T/F's
| Sr.No. |
Capacity of DS T/F |
No. of DS T/Fs de-loaded |
| Ending 4/09 to 11/09 |
During
12/09 |
upto 12/09 |
1 |
25 KVA |
136 |
0 |
136 |
2 |
63 KVA |
122 |
2 |
124 |
3 |
100 KVA |
45 |
4 |
49 |
4 |
200 KVA |
4 |
0 |
4 |
|
Total |
307 |
6 |
313 |
7. Distribution Transformers
Sr.No. |
Distribution T/Fs (in KVA) |
upto 11/09 |
During
12/09 |
upto 12/09 |
(Nos.) |
(Nos.) |
(Nos.) |
1. |
5 KVA |
131 |
0 |
131 |
2. |
6.3 KVA |
5126 |
164 |
5290 |
3. |
10/16 KVA |
7849 |
230 |
8079 |
4. |
25 KVA |
14280 |
18 |
14298 |
5. |
63 KVA |
18996 |
20 |
19016 |
6. |
75 KVA |
0 |
0 |
0 |
7. |
100 KVA |
11816 |
4 |
11820 |
8. |
200 KVA |
2043 |
2 |
2045 |
9. |
300 KVA |
335 |
- |
335 |
10. |
400 KVA |
25 |
- |
25 |
11. |
500 KVA |
221 |
- |
221 |
12. |
750 KVA |
44 |
- |
44 |
13. |
1000 KVA |
28 |
- |
28 |
Total |
60894 |
438 |
61332 |
8. UPS to Villages
| a) Total No of Villages |
Nos.3077 |
|
Nos. |
| b) UPS given end. 31.12.06 |
Nos. 3069 |
|
Nos. |
9. T&D Losses
Billing cycle |
Ending 12/2008 |
Ending 12/2009 |
% Increase/ Decrease |
| Ending |
27.77 |
26.8 |
0.97 |
10. APDRP Works
Area |
Amount for which scheme is sanctioned |
Amount to be spent by DS |
Amount utilised |
%age utilization |
| Batala |
160.57 |
1305.86 |
527.31 |
4038 |
| Gurdaspur |
480.40 |
480.46 |
363.30 |
75.62 |
| Pathankot |
1171.23 |
840.38 |
481.71 |
57.37 |
| Suburban Asr |
9383 |
9383 |
5492 |
58.53 |
| T/Taran |
346.21 |
344.26 |
157.27 |
45.68 |
| City Asr |
4489.76 |
2665.37 |
2534.49 |
95.08 |
| Total |
17501.17 |
15019.27 |
9556.08 |
63.62 |
11.
Revenue of West Zone
(Rs. In lacs) |
upto 11/09 |
During
12/09 |
upto 12/09 |
58966.75 |
8284.99 |
67251.74 |
12. Replacement of Electro-mechanical Meters with Electronics Meters
| Category |
No. of Connections |
Replaced with Electronics Meters |
%age |
During
12/09 |
upto 12/09 |
| DS |
1-Ph |
851698 |
3078 |
607619 |
71.34 |
| |
3-Ph |
19519 |
18 |
12657 |
64.84 |
| CS |
1Ph |
150711 |
401 |
109620 |
72.74 |
| |
3-ph |
6041 |
13 |
4613 |
76.36 |
| SP |
|
19564 |
75 |
19563 |
99.99 |
| MS |
|
2761 |
-22 |
2761 |
100.00 |
| Total |
|
1050294 |
3563 |
756833 |
72.06 |
13. Progress of installation of MCBs
Cate-
gory |
No. of Connections |
MCBs provided |
Balance |
During
12/09 |
upto 12/09 |
| DS |
835034 |
3898 |
337193 |
497841 |
| CS |
152896 |
435 |
55764 |
97132 |
| Total |
987930 |
4333 |
392957 |
594973 |
14. Defaulting Amount
Ending 3/2009 |
|
|
|
Category |
PDCOs |
Others |
Total Recov. Def.Amt. |
|
No. |
Amt |
No |
Amt |
No |
Amt |
ISC |
4918 |
551.01 |
850 |
93.47 |
5768 |
644.48 |
AP |
444 |
26.1 |
107707 |
6190.98 |
108151 |
6217.08 |
GSC |
101786 |
4506.61 |
77411 |
1795.02 |
179197 |
6301.63 |
| Others |
298 |
11.01 |
61 |
1.67 |
359 |
12.68 |
Total |
107446 |
5094.73 |
186029 |
8081.14 |
293475 |
13175.87 |
Ending 12/2009 |
|
|
|
Category |
PDCOs |
Others |
Total Recov. Def.Amt. |
|
No. |
Amt |
No |
Amt |
No |
Amt |
ISC |
4609 |
573.57 |
1475 |
119.18 |
6084 |
692.75 |
AP |
438 |
25.85 |
107492 |
6228.47 |
107930 |
6249.32 |
GSC |
102721 |
4058.26 |
97682 |
2313.11 |
200403 |
6931.37 |
Others |
250 |
8.65 |
73 |
12.45 |
323 |
21.1 |
Total |
108018 |
4666.33 |
206722 |
8673.21 |
314740 |
13894.54 |
15. Meter Pillar Boxes Installed =Nos 652. detection of Theft of energy Ending 3/2009
Description |
Upto 11/2009 |
During 12/2009 |
Upto 12/2009 |
| a) No. of Connections Checked |
375565 |
39211 |
414776 |
| b) No. of acses Detected |
31246 |
2680 |
33926 |
| c) Amount Charged ( Rs in Lacs) |
3845.52 |
156.83 |
4002.35 |
| d) Amount Recovered ( Rs in lacs) |
757.87 |
62.62 |
820.49 |
16. Key -exceptions ending 12/2009
Description |
GSC Ending |
SP Ending |
| Meter Defective |
52286 |
67 |
| Meter Burnt |
9447 |
34 |
| Meter Glass Broken |
531 |
0 |
| M&T seal Broken |
4910 |
2 |
| Total |
67174 |
103 |
17. Meters Taken out From the Premises of Consumers
| |
|
|
Category |
Total No. of Connections |
Meters taken out of the Premises of Consumers |
| |
|
Ending 12/2008 |
Ending 12/2009 |
DS |
871217 |
296255 |
305993 |
NRS |
156752 |
41151 |
48412 |
SP |
19564 |
10352 |
14805 |
MS |
2761 |
1038 |
1879 |
Total |
1050294 |
348796 |
371089 |
SE/ Hqr-cum-ADMN
Border Zone,
Amritsar.
Suburban Circle Amritsar Ending 3/09
| |
1.1 |
66/11Kv Grid Sub Stn. |
|
|
28. Nos |
|
|
| |
1.2 a) |
66 Kv Feeders |
|
|
31. Nos |
|
|
| |
|
Length of 66 KV Lines |
|
|
264 Km |
|
|
| |
b) |
11 Kv Feeders |
|
|
388Nos |
|
|
| |
|
Length of 11Kv Lines |
|
|
7183 Km |
|
|
| |
|
Lenth of LT Lines |
|
|
11179 |
|
|
| |
|
HT/LT Ratio |
|
|
|
1:1:57 |
|
|
No of D/S T/F's capacity wise ending -16991 NO |
| 5KVA |
6.3Kva |
10 Kva |
16 Kva |
25 Kva |
63Kva |
100 Kva |
200 Kva |
300 Kva |
400 Kva |
500KVA |
630 Kva |
750Kva |
800 Kva |
1000 Kva |
| 126 |
643 |
907 |
78 |
3744 |
6326 |
4398 |
548 |
109 |
18 |
64 |
6 |
14 |
- |
10 |
F) No. Current complaints per thousand consumers:During1/09-
During 01/10-
G) Reliability Index: During 1/09-94.76%
During 01/10-95.00%
1.3 Peak Demand: = 522MW
1.4 No of Consumers & connected load = 360871 Nos.; C. Load = 1165.551 MW
|
Category |
|
As on 01/09 |
Load in Kw |
|
|
DS |
|
|
249398 |
|
397315 |
|
|
CS |
|
|
33062 |
|
102845 |
|
|
SP |
|
|
6581 |
|
63810 |
|
|
MS |
|
|
1280 |
|
73200 |
|
|
LS |
|
|
196 |
|
119564 |
|
|
AP/SP |
|
|
809 |
|
2572 |
|
|
AP METERED |
|
1552 |
|
4170 |
|
|
AP UNMETERED |
|
67799 |
|
372084 |
|
|
SL |
|
|
128 |
|
1785 |
|
|
BS |
|
|
66 |
|
28206 |
|
|
TOTAL |
|
|
360871 |
|
1165551 |
|
2 |
Energy accounting |
|
|
|
|
2.1 |
Energy cosumption per year |
|
|
550.8M:US |
|
|
|
|
Ending1/09 |
Ending 1/10 |
Diff |
Inc/Dec |
|
|
2.2 |
Energy input in lacs |
17392.12 |
18889.75 |
1497.63 |
8.61 |
|
|
|
|
|
|
|
|
|
2.3 |
Energy sold in lacs |
11879.84 |
13325.09 |
1445.25 |
12.16 |
|
|
|
|
|
|
|
|
|
2.4 |
Energy losses |
31.69 |
29.46 |
- |
-2.23 |
|
|
|
|
|
|
|
|
|
2.5 |
Revenue assessed 2007/08 |
2008-09 |
End 1/09 |
End 1/10 |
%age Increse /Decrese |
|
|
(In Lacs) |
25611.11 |
29648.01 |
25194.14 |
30065.62 |
19.34 |
|
|
|
|
|
|
|
|
|
2.6 |
Sundry Debter |
1/09 |
|
|
1/10 |
|
|
Assesment |
Relization |
Recovery % |
|
Assesment |
Relization |
Recovery % |
|
22232.85 |
21768.38 |
97.91 |
|
26546.95 |
25872.26 |
97.46 |
|
|
|
|
|
|
|
|
2.7 |
Deft Amt |
Total Amt |
Recoverable |
|
|
|
|
End 12/09 |
5261.69 |
|
4316.84 |
|
|
|
|
End 01/10 |
5315.56 |
|
4364.65 |
|
|
|
|
|
|
|
|
|
|
|
3 |
Total No. of villages |
|
|
721 No +13 Cluster |
|
|
|
3.1 |
No of vill. Given 24 hrs supply given |
|
721 No +13 Cluster |
|
|
|
3.2 |
No of vill. Given 24 hrs supply |
|
0+0 Cluster |
|
|
|
|
yet to be given |
|
|
|
|
|
TARN TARAN CIRCLE ENDING 31.12.2009 |
|
|
|
|
|
|
|
|
1 |
|
|
Profile. |
|
|
|
|
1.1 |
66/11Kv Grid Sub Stn. |
|
|
38. Nos |
|
|
1.2 |
66Kv Feeder |
|
|
34 Nos |
|
|
|
11Kv Feeders |
|
|
370 No |
|
|
|
Lenth of 11 Kv Feeders |
|
|
8821 KM |
|
|
|
Lenth of L.T. Line |
|
|
12122 KM |
|
|
|
HT/LT Ratio |
|
|
|
01:1:08 |
|
|
No of D/S T/F's capacity
wise ending 31.12.2009 |
<25 Kva |
25 Kva |
63Kva |
100 Kva |
200 Kva |
300 Kva |
400 Kva |
500 Kva |
750Kva |
800 Kva |
1000KVA |
8405 |
5420 |
6293 |
3421 |
171 |
24 |
2 |
9 |
3 |
1 |
1 |
No Current complants
per thousand consumers -23753 |
Relliability index |
During 3/2009 |
During 12/2009 |
|
|
|
|
72.31 |
|
71.32 |
|
1.3 |
Peak Demand |
|
|
|
|
|
1.4 |
No. of consumer & connected Load |
|
No-273865 |
Load-824133 |
|
|
AP Temproary |
|
|
|
|
|
|
|
|
|
|
|
|
|
Category |
|
As on 31/12/2009 |
Load in Kw |
|
|
DS |
|
170854 |
|
209274 |
|
|
|
CS |
|
21672 |
|
44134 |
|
|
|
SP |
|
3013 |
|
25611 |
|
|
|
MS |
|
193 |
|
10744 |
|
|
|
LS |
|
47 |
|
22796 |
|
|
|
AP/SP |
|
43 |
|
322 |
|
|
|
AP METERED |
50 |
|
247 |
|
|
|
AP UNMETERED |
77943 |
|
492495 |
|
|
|
SL |
|
9 |
|
184 |
|
|
|
BS |
|
40 |
|
7526 |
|
|
|
Rly Traction |
1 |
|
10800 |
|
|
|
TOTAL |
|
273865 |
|
824133 |
|
|
|
|
|
|
|
|
|
|
2 |
Energy accounting |
In put end 31.12.2008 |
10963.57 |
|
|
2.1 |
Energy cosumption per year |
|
31.12.2009 |
11565.6 |
|
|
|
|
Ending12/2008 |
Ending 12/2009 |
Inc/Dec |
|
|
2.2 |
Energy input in lacs |
10963.57 L. U. |
11565.6 |
|
(-)5.49% |
|
|
|
|
|
|
|
|
|
2.3 |
Energy sold in lacs |
8079.11 |
8571.73 |
|
(-)6.10% |
|
|
|
|
|
|
|
|
|
2.4 |
Energy losses |
26.31% |
25.89% |
|
(-)0.42% |
|
|
|
|
|
|
|
|
|
2.5 |
Revenue assessed 2008/09 End 12/09 |
End 12/2008 |
End 12/2009 |
Inc/Dec % |
|
(In Lacs) |
8724.09 |
7799.28 |
6739.7 |
7799.28 |
(+)15.72% |
|
|
|
|
|
|
|
|
|
2.6 |
Sundry Debter |
Ending 3/2008 |
|
|
Ending 12/2009 |
|
|
Assesment Realisation |
Recoery % |
Assesment Realisation |
Recoery % |
|
8667.41 |
8517.79 |
98.27% |
7799.28 |
7160.91 |
|
91.82% |
|
|
|
|
|
|
|
|
2.7 |
Deft Amt |
Total Amt |
Recoverable |
|
|
|
|
" 3/2008 |
6583.87 |
64040.84 |
|
|
|
|
|
" 3/2009 |
6668.95 |
6269.71 |
|
|
|
|
|
" 6/09 |
6781.32 |
6552.24 |
|
|
|
|
|
" 9/2009 |
6917 |
6449.57 |
|
|
|
|
|
" 12/2009 |
7006.81 |
6530.78 |
|
|
|
|
|
|
|
|
|
|
|
|
3 |
Total villages |
|
|
612 No |
|
|
|
3.1 |
No of vill. Given 24 hrs supply |
|
612 NO |
|
|
|
3.2 |
No of vill. Given 24 hrs supply |
|
Nil |
|
|
|
|
yet to be given |
|
Nil |
|
|
|
3.3 |
Growth of conn. During 2008-09 |
3.22% |
|
|
|
3.4 |
Growth of load During 2009-10 |
|
12.50% |
|
|
|
3.5 |
Total conn. Released 2008/09 |
|
6468 NO |
|
|
|
|
Total conn. Released 2009/10 |
|
9655 NO |
|
|
|
3.6 |
Total load Released 2008/09 |
|
14963Kw |
|
|
|
|
Total load Released 2009/10 |
|
19885Kw |
|
|
|
3.7 |
Pending App End 31.12.2009 |
|
31099 NO |
|
|
|
3.8 |
Pending App load End 31.12.2009 |
|
99471 K W |
|
|
|
|
|
|
|
|
|
|
|
|
66/11 KV Grid Sub Station |
|
|
|
|
|
|
|
|
33/11 KV Grid Sub Station |
|
|
|
|
|
|
|
|
66KV Feeders |
|
|
|
|
|
|
|
|
|
33KV Feeders |
|
|
|
|
|
|
|
|
|
Length of 66KV Line |
|
|
|
|
|
|
|
|
Length of 33KV Line |
|
|
|
|
|
|
|
|
11KV Feeders |
|
|
|
|
|
|
|
|
|
Length of 11KV Line |
|
|
|
|
|
|
|
|
Length of LT Line |
|
|
|
|
|
|
|
|
|
HT/LT Ratio |
|
|
|
|
|
|
|
|
|
No.of Distribution T/Fs capacity-wise ending 12/2009
|
|
|
|
|
|
Total No.of Distribution T/Fs
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
100KVA |
|
|
|
|
|
|
|
|
|
|
3835 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
200KVA |
300KVA |
400KVA |
500KVA |
750KVA |
1000KVA |
1200KVA |
Total |
|
|
|
492 |
50 |
11 |
23 |
1 |
0 |
1 |
19306 |
|
|
|
|
|
|
|
|
|
|
|
|
|
NO.of current complaints per thousand consumers:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
No.of Consumers & Connected load ending
12/2009 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
354856 |
|
|
459244 |
|
|
|
|
|
|
|
55634 |
|
|
114520 |
|
|
|
|
|
|
|
6432 |
|
|
52901 |
|
|
|
|
|
|
|
578 |
|
|
34626 |
|
|
|
|
|
|
|
187 |
|
|
94106 |
|
|
|
|
|
|
|
349 |
|
|
866 |
|
|
|
|
|
|
1118 |
|
|
6943 |
|
|
|
|
|
|
81824 |
|
|
262423 |
|
|
|
|
|
|
65 |
|
|
1944 |
|
|
|
|
|
|
|
66 |
|
|
32484 |
|
|
|
|
|
|
|
501112 |
|
|
1060432 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Energy consumption per year
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Energy Input (In Lacs) |
|
|
12391.34 |
13167.76 |
6.27 |
|
|
|
|
Energy Sold (In Lacs) |
|
|
9397.91 |
10010.36 |
6.12 |
|
|
|
|
Energy losses |
|
|
24.16 |
23.98 |
-0.18 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Revenue Assessed(In Lacs)
|
|
|
|
|
|
|
|
|
|
Ending |
|
|
|
%Increase/Decrease |
|
|
|
|
12/2008 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
12.06 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Ending 31.3.2007 |
|
2256.45 |
1184.55 |
|
|
|
|
|
|
Ending 31.3.2008 |
|
2593.68 |
1232.47 |
|
|
|
|
|
|
Ending 31.3.2009 |
|
2448.62 |
1188.19 |
|
|
|
|
|
|
Ending 6/2007 |
|
2463.25 |
1169.14 |
|
|
|
|
|
|
Ending 6/2008 |
|
2678.85 |
1244.59 |
|
|
|
|
|
|
Ending 9/2007 |
|
2644.56 |
1211.38 |
|
|
|
|
|
|
Ending 9/2008 |
|
2787.18 |
1265.92 |
|
|
|
|
|
|
Ending 12/2007 |
|
2647.92 |
1204.70 |
|
|
|
| |
|
|
Ending 12/2008 | |
2616.32 |
1252.39 | |
|
|
|
|
|
Ending 12/2009 |
|
1799.10 |
1345.95 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
No.of Village given 24 hrs. supply
|
|
|
|
|
|
|
|
|
Bechirage Village |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
City Circle Amritsar Ending 31.3.2009
Profile
1.1 |
66/11Kv Grid Sub Stn. |
|
|
4. Nos |
|
|
1.2 a) |
66 Kv Feeders |
|
|
4. Nos |
|
|
| |
Length of 66 KV Lines |
|
|
|
|
|
b) |
11 Kv Feeders |
|
|
75Nos |
|
|
|
Length of 11Kv Lines |
|
|
247.107 Km |
|
|
|
Lenth of LT Lines |
|
|
341.252Km |
|
|
|
HT/LT Ratio |
|
|
|
01:1:38 |
|
|
No of D/S T/F's capacity wise ending 31.03.09 |
16 Kva |
25 Kva |
63Kva |
100 Kva |
200 Kva |
250 Kva |
300 Kva |
400 Kva |
500 Kva |
630 Kva |
750 Kva |
800 Kva |
1000Kva |
Total |
7 |
14 |
35 |
176 |
784 |
1 |
166 |
7 |
137 |
7 |
5 |
15 |
17 |
1371 |
F) No. Current complaints per thousand consumers
Reliablilty Index |
Ending 1/2009 |
Ending 1/2010 |
City Circle Amritsar |
92.69 |
89.60 |
1.3 |
Peak Demand: |
Ending 1/2009 |
Ending 1/2010 |
|
|
194.54 MW |
199.38MW |
1.4 |
No. of Consumers & connected load ending 1/2010 |
Total No. of connections |
Connected Load)In KW) |
|
|
148621 |
535410 |
|
Category |
|
As on 31.1.2010 |
Connected Laod
(In KW) |
|
|
DS |
|
|
98172 |
|
284269 |
|
|
CS |
|
|
45940 |
|
160155 |
|
|
SP |
|
|
3565 |
|
36664 |
|
|
MS |
|
|
746 |
|
30964 |
|
|
LS |
|
|
29 |
|
17283 |
|
|
AP/SP |
|
|
0 |
|
0 |
|
|
AP METERED |
|
34 |
|
175 |
|
|
AP UNMETERED |
|
0 |
|
0 |
|
|
SL |
|
|
127 |
|
2388 |
|
|
BS |
|
|
5 |
|
2794 |
|
|
Rly Traction |
|
|
0 |
|
0 |
|
|
Grid |
|
|
3 |
|
718 |
|
|
TOTAL |
|
|
148621 |
|
535410 |
|
2 |
Energy accounting |
|
|
|
|
2.1 |
Energy cosumption per year |
|
|
|
|
|
|
|
Ending1/2009 |
Ending 1/2010 |
|
Inc/Dec |
|
|
2.2 |
Energy input in lacs |
5434.38 |
5434.50 |
|
|
|
|
|
|
3967.66 |
4058.55 |
|
|
|
2.3 |
Energy sold in lacs |
26.99 |
25.32 |
|
|
|
|
|
|
14537.34 |
16743.07 |
|
|
|
2.4 |
Energy losses |
|
|
|
|
|
|
|
|
|
|
|
|
|
2.5 |
Revenue assessed |
|
|
|
|
|
(In Lacs) |
17197.46 |
16597.38 |
|
-3.49 |
|
|
|
|
|
|
|
|
|
|
2.6 |
Sundry Debter |
Ending 1/2009 |
|
|
Ending 1/2010 |
|
|
Assesment |
Relization |
Recovery % |
|
Assesment |
Relization |
Recovery % |
|
14847.87 Lacs |
14717.08Lacs |
99.12 |
|
16640.15 Lacs |
16858.43 Lacs |
101.31 |
|
|
|
|
|
|
|
|
2.7 |
Deft Amt |
Total Amt |
Recoverable |
|
|
|
|
End 3/08(In Lacs )(Audited) |
2164.79 |
1706.60 |
|
|
|
|
|
End 3/09(In lacs) (Tentative) |
2113.47 |
1749.11 |
|
|
|
|
|
|
|
|
|
|
|
|
3 |
Total No. of villages |
|
Nil |
|
|
|
|
3.1 |
No of vill. Given 24 hrs supply given |
Nil |
|
|
|
|
3.2 |
No of vill. Given 24 hrs supply |
Nil |
|
|
|
|
|
yet to be given |
|
|
|
|
|
3.3 |
Growth of connection 4/09 to 1/2010 |
1.07% |
|
|
|
|
3.4 |
Growth of load 4/09 to 1/2010 |
2.57% |
|
|
|
|
3.5 |
Total connection released 4/09 to 1/2010 |
2834Nos |
|
|
|
|
3.6 |
Total Load released 4/09 to 1/2010 |
12202KW |
|
|
|
|
3.7 |
Pending applications ending 31.1.2010 |
195Nos |
|
|
|
|
3.8 |
Pending applications load ending 31.1.2010 |
4891KW |
|
|
|
|
|
|
|
|
|
|
|